A remodel that touches structure, systems, and more than one room is a construction project, not a shopping trip. We connect Utah homeowners with general contractors who run that kind of work from design through final inspection.
Design, engineering and permitting come before a number that means anything.
Five kinds of work that share one requirement: a general contractor who can hold design, structure, permitting, and a subcontractor schedule together.
A whole-home renovation is a sequencing problem before it is a design problem. Systems, structure, and finishes all move at once, and the order they move in decides whether you can stay in the house while it happens.
Learn more →New square footage means foundation, framing, and a roof tie-in, plus an exterior that has to read as one house when it is done. The tie-in and the match are where additions get difficult, not the new room itself.
Learn more →Taking out a wall is the easy part. Knowing what that wall carries, where the load goes instead, and what beam, post, and footing the new path requires is engineering work that happens before anyone swings a hammer.
Learn more →Older houses hold surprises behind the plaster: outdated wiring, undersized panels, galvanized supply lines, framing a previous owner modified. Renovating one well means budgeting for what demo reveals instead of pretending it will not show up.
Learn more →You already own the square footage. Turning a garage, attic, or unfinished bonus space into living area still means insulation, heating and cooling, code review, and structure and systems that were never sized for a room people live in.
Learn more →On a whole-house project you are not buying framing or drywall. You are buying coordination: a general contractor who holds the schedule, sequences the subcontractors, keeps the inspection calendar in mind, and makes sure the electrician is not standing in a room the framer has not finished. That is the actual service being purchased, and it is the difference between a job that moves and a job that sits idle because nobody ordered the right thing at the right time. When you compare contractors on work at this scale, compare how they run a schedule, not only what they charge to run it.
The two things that reliably blow up budgets on projects this size are scope creep and unclear allowances. Scope creep is the decision made in week five that was never in the drawings, usually the wall you decided to move once you could finally see the space. Allowances are the placeholder numbers standing in for things you have not picked yet, and a thin allowance makes an estimate look better than the job is going to be. Ask what is carried as an allowance, what number sits behind it, and what happens when your actual selection lands above it.
Anyone can give you a number over the phone. Nobody can give you a number that survives contact with the house. A whole-house remodel gets priced accurately after someone has drawn it, after an engineer has weighed in on anything structural, and after the scope is specific enough that two contractors would read it the same way. Structural, electrical, plumbing, and mechanical changes are permitted and inspected work, and the drawings that get a permit are the same drawings that make an estimate meaningful. Design first, then pricing. Reversing that order is how homeowners end up comparing numbers that were never comparable.
The other early decision is where you will sleep. Most whole-house projects mean either living inside a construction zone with a kitchen set up in the garage, or moving out and handing the crew the entire house. That is not only a comfort question, because it changes sequencing. A crew working around a family phases the work room by room, protects finished areas, and moves slower by design. A crew with an empty house can open several fronts at once. Decide early, because the schedule and the plan get built around whatever the answer is.
Three steps, and the first one is a conversation rather than a form you never hear back from.
More room, a better plan, or a house that suits how you actually live. What the project is for decides whether you are looking at a renovation, an addition, or both.
What carries load, what the foundation will take, where systems run, and what the lot allows. Those answers shape the design rather than being worked around afterward.
Structural drawings get reviewed before anything is framed. A contractor who sequences it that way is giving you a number that means something.
Across the Wasatch Front, from Ogden south through Utah County.
It depends on what you are changing. Reconfiguring rooms or adding square footage usually needs someone doing design, an architect or a designer, to produce drawings a building department will accept. Anything structural, such as removing a bearing wall or tying an addition into an existing roof, usually needs an engineer to specify the beam, the posts, and the load path below them. Many projects need both, and that work happens before pricing means anything.
Not from a photo, and honestly not from standing in the room either. The direction of the joists above, what is sitting in the attic, whether the wall lines up with a beam or a footing below, and whether a previous owner already changed something all matter. That answer usually comes from an engineer, and on any wall you actually intend to remove it should. Guessing here is the expensive kind of wrong.
Closely, usually. Exactly, sometimes not. Siding profiles get discontinued, brick from a particular run is no longer made, and roofing weathers. A good contractor will tell you up front where the match will be seamless and where it will be a close approximation, and will sometimes propose a deliberate transition, a change of plane or material, so the eye reads the junction as intentional rather than as a near miss.
Not always, but decide before the schedule is built rather than in week three. Staying means phasing, dust control, and a stretch without a kitchen or a bathroom you rely on. Moving out means the crew can work several fronts at once. Neither answer is automatically right. What matters is that the contractor plans around the real one, because a phased job and an empty-house job are sequenced differently from the first day.
Often. Heating and cooling equipment was sized for the house you have, not the house you are building, and conditioned space you add can push it past what it can serve. The same goes for the electrical panel, particularly in older homes where the panel had little headroom to begin with. This gets evaluated during design rather than discovered at the end, because it affects both the plan and the budget.
Describe the house and what you are planning, or call 801-644-9000.
Get Help With ThisDescribe the house and what you are planning, or call 801-644-9000.